Deterministic processing time are no longer applicable under realistic circumstances because of the uncertainties involved in manufacturing and production processes. The present study aims to address a multiobjective distributed assembly flexible job shop scheduling problem with type-2 fuzzy time (DAT2FFJSP), focusing on the optimization objectives of minimizing the makespan and total energy consumption. To address this problem, a mixed-integer linear programming model is presented.
View Article and Find Full Text PDF