In this paper, we take the four-way shuttle system as the research object and establish the mathematical model of scheduling optimization based on the minimum time for the in/out operation optimization and path optimization scheduling problems of the four-way shuttle system. An improved genetic algorithm is used to solve the task planning, and an improved A* algorithm is used to solve the path optimization within the shelf level. The conflicts generated by the parallel operation of the four-way shuttle system are classified, and the improved A* algorithm based on the time window method is constructed for path optimization through the dynamic graph theory method to seek safe conflict-free paths.
View Article and Find Full Text PDF