Crew scheduling problem is divided into crew pairing problem (CPP) and crew rostering problem (CRP). In this paper, a rostering model is presented to assign crew to pairings in such a way that total weighted preference is maximized. Crew members declare which parings they wish to be assigned and which ones are undesirable for them.
View Article and Find Full Text PDFIn this article, a novel integrated mixed-integer nonlinear programming model is presented for designing a cellular manufacturing system (CMS) considering machine layout and part scheduling problems simultaneously as interrelated decisions. The integrated CMS model is formulated to incorporate several design features including part due date, material handling time, operation sequence, processing time, an intra-cell layout of unequal-area facilities, and part scheduling. The objective function is to minimize makespan, tardiness penalties, and material handling costs of inter-cell and intra-cell movements.
View Article and Find Full Text PDF